Road work on Route 6 and Harbour Road in Grand Tracadie

Road work is scheduled to begin on Monday, August 5 on Route 6 and Harbour Road in the community of Grand Tracadie.

The work includes road widening for left and right turn lanes on Route 6 to Rink Road, construction of a cul-de-sac on Harbour Road, asphalt milling, and placement of asphalt. 

Construction starts 60 meters east from the Watts Road and continues for 540 meters easterly along Route 6.

Delays can be expected. Single lane alternating traffic will be in effect. Drivers are asked to slow down, be prepared to stop and obey signs and traffic control personnel. Work is expected to be complete by September 13.

For more information on road construction and road conditions across PEI, visit 511.

Media contact:
Janice Fogarty
Department of Transportation and Infrastructure
902-213-6927
jefogarty@gov.pe.ca

Last Updated Date

Friday, August 2, 2024 - 1:28pm
Transportation, Infrastructure and Energy department logo

General Inquiries

Department of Transportation and Infrastructure
3rd Floor, Jones Building
11 Kent Street,
P.O. Box 2000,
Charlottetown, PE C1A 7N8

Phone: 902-368-5100
Fax: 902-368-5395


Access PEI/Highway Safety Head Office
33 Riverside Drive
Charlottetown, PE
Phone: 902-368-5200
accesspeicharlottetown@gov.pe.ca

Road-Related Inquiries: roads@gov.pe.ca

All other Transportation and Infrastructure inquiries: DeptTI@gov.pe.ca

Report Transportation Problems

DeptTI@gov.pe.ca